Corrosion prevention system

  • Concrete Drilling Work
Client :
Date :
Place :
Project Infomation :

Core drilled 10,000 holes into concrete beams to allow for the installation of electric anodes.All operators were either in wet suits or dry suits depending on the water temperature.
Timing for this project was criticle with work being carried out during low tide only. Also to minimise any disruption to the port operator.

Megasaw worked day and night and easily finished this project by the required date.