Core drilled 750mm diameter holes through 1m thick suspended concrete slabs including 4 layers of 32mm diameter steel reinforcing bars.
Each penetration had a support placed underneath for the completed core to rest on. A lifting bracket was then attached to the core and a crane was used to remove them. Equipment picture only, due to wharf regulations.