D.P World Dock strengthening

Date : 17/05/2013
Place : Docklands Melbourne

Project Infomation :

Core drilled 750mm diameter holes through 1m thick suspended concrete slabs including 4 layers of 32mm diameter steel reinforcing bars.

Each penetration had a support placed underneath for the completed core to rest on.
A lifting bracket was then attached to the core and a crane was used to remove them. Equipment picture only, due to wharf regulations.